In January 2006 an unfortunate boat accident occured when a ferry crashed into Wharf 2 at Australias busiest harbour-Circular Quay. Sydney Ferries were required to rebuild the wharf and include a salt water resistant lift to float on the Wharf.

This prestige job in the heart of Sydney between the Opera House and the Harbour Bridge with a short delivery timetable and high technical requirement, meant that Lift Shop was the favoured choice with its marine durable lift. (Shaft in glass and AIS 316 Marine Grade Stainless Steel)

The Lift Shop team was selected due to its proven ability to promptly and reliably deliver.
The entire project was completed on budget and under time in 14 weeks.