- Delivery to Site (In order to facilitate efficient and safe materials handling)
- Provide level clear access for delivery of the lift equipment
- Delivery of the lift to site is by a truck with Hiab. The equipment and packaging weighs approximately 400kg
- We allow two men two hours for delivery. If delivery is difficult, we may need assistance or an extra fee will be charged. We must be able to carry the equipment a maximum of 50m to the lift location, along smooth and hard level ground
- If required provide a crane or forklift to assist in safe equipment delivery
- Storage (equipment needs to be stored properly)
- Provide dry, clean, safe and secure storage of the lift equipment whilst it is on site
- The location of the storage area must be within 10m of the lift location
- Area required is approximately 2mē (for four to six items and boxes, weighing 400kg)
- During construction and installation
- Provide rubbish bins; The lift equipment comes in cardboard boxes and packing crates and will be about 1mē of rubbish will result from unpacking (a small skip bin is usually sufficient).
- Lift pit
- Pit to be built to the required drawing dimensions
- Floor under lift platform is to be solid and level
- Install conduits as per drawing to approximately 100mm above the pit floor and to the top side of the landing side of the pit. All conduits require draw wires.
- One 20mm minimum diameter conduit from the Lift isolator to the pit
- One 20mm minimum conduit from the gate handle side (top landing) to the pit
- One 20mm minimum conduit from the gate hinge side (top landing) to the pit
- One 20mm minimum conduit from the top landing call station to the pit
- One 20mm minimum conduit from the bottom landing call station to the pit
- Floor must be able to sustain loads as specified and must comply with AS 1735
- We suggest installation of the lift to be done after the finish floor has been installed
- Drain with a non-return valve is required if the lift is to be installed in an outdoor location or is prone to flooding
- If required please provide floor protection
- Lift walls
- Lift shaft is to be smooth and plumb. The wall below the top landing will have rails installed for the lift and a plumb surface is required
- The shaft wall below the top landing needs to be solid to allow fixing for the lift rail
- The top landing gate requires supports at either side which will support the top landing gate and the rail for the lift
- The surrounds around the top landing gate, landing buttons, floor sills and all penetrations will need to be completed after installation of the lift
- Clearance at the left and right hand walls needs to be a minimum of 100mm
- Electrical
- Provide a separate 20amp single phase electrical supply terminating to a locakbale isolator near the location of the lift. A power feed is to be run from the isolator to the conduit located in the bottom of the pit (in accordance with AS3000)
- Provide lighting, emergency lighting and general purpose power to the lift area
- Provide general lighting to the top and bottom call stations